Job story · Werribee · July 2026
A new wall framed for a renovation, Werribee
Part of a renovation close to home: we framed a new stud wall with a doorway, square and plumb and ready for the next trades.
1
Framed
A new stud wall with a doorway, set out to suit the new layout of the rooms.


Got a job like this?
Send us a few photos and we'll come back with a free quote. More on our carpentry & repairs.
More jobs

A new front door with a curved glass panel
A new front door hung, fitted with its hardware and finished, looking sharp from the street and from the hallway.

Top-floor windows and French doors, Hawthorn
Working off scaffold on a top-floor flat, we fitted and adjusted the timber windows and French doors so they open, close and lock the way they should.

A truck hit this house. We put it right.
A truck clipped the edge of this garage roof. It crushed the fascia and gutter end and left the roof frame open to the weather.